PROJECT OVERVIEW

Inovis Energy and partner Graybar Electric teamed up to bring energy efficient lighting to Oldcastle Infrastructure’s Chandler, AZ facility.

BY THE NUMBERS

8,480

Annual kWh savings

Inovis did an outstanding job for us, their team truly performed to the highest level of standard and care. This initiative has instilled a morale boost for our workers while also providing an increased level of safety and efficiency for our operations. Oldcastle Infrastructure is looking forward to future upgrades at other factory locations with the Inovis team”.”
Bill Ader |
Business Transformation Manager

THE BEFORE

The existing lighting system at Oldcastle Infrastructure was aging and light levels were low. Fluorescent tubes required frequent replacing, and the manufacturing space was significantly under-lit. They were looking for a system that would increase light levels and reduce the operating and maintenance expenses.

THE AFTER

The project began with a site assessment by Inovis Energy’s distribution partner Graybar Electric. Graybar provided a new design as well as photometric layout to improve light levels with new LED lighting throughout the facility. Inovis confirmed the design work and provided a plan to replace the aging lighting with an energy efficient and cost-effective solution.

THE RESULTS

The retrofit reduces Oldcastle’s annual lighting costs while significantly increasing light output. In addition to cost savings, this provided a safer and more productive environment for its employees.

ANNUAL SAVINGS EQUAL TO CO2 EMISSIONS FROM...

13,249

Pounds of CO2 in the atmosphere

15,103

Miles drived by an average vehicle

676

Gallons of gasoline consumed

1

Home’s electricity uses for one year

14

Barrels of oil consumed

Project Highlights

Customer: 

Oldcastle Infrastructure

Industry: 

Utility Company: 

National Grid